Construction of a new Crestview Interstate 10 interchange has begun.
florida department of transportation
Light at Galliver Cutoff, safety signal at Baker crosswalk recommended
A Florida Department of Transportation study identified a traffic light is needed at the intersection of Galliver Cutoff and State Road 4 in Baker.
Hwy 90 to be resurfaced
Resurfacing of Hwy 90 between Antioch and Old Bethel roads begins May 3.
Addressing traffic problems on Garçon Point Bridge
The Santa Rosa County Sheriff's Office has begun targeting reckless drivers on the Garçcon Point Bridge.
FDOT conducting I-10 widening study
The Florida Department of Transportation is conducting a study to widen Interstate 10 from four to six lanes from exit 22 to exit 56 in Crestview.
Hwy 189 resurfacing begins
The 14-miles stretch of Hwy 189 will be resurfaced beginning the week of May 11.
Bypass construction begins on PJ Adams Monday
Construction will finally begin Monday on the long-awaited Crestview bypass project.
Bridge repairs continue Friday
The Mid-Bay Bridge will be closed during late hours Friday night through Saturday morning for continuing repair work.
New I-10 eastbound travel lane opens next week
The new eastbound travel lane on I-10 between Avalon Boulevard and the Eacambia Bay Bridge is scheduled to open next week.
Mid-Bay Bridge to close temporarily
The Mid-Bay Bridge will close tonight for repairs, but reopen tomorrow morning.