Mid-Bay Bridge work planned

http://www.zmina.com/Sign.jpgCHIPLEY, Fla., March 27, 2020—Maintenance work on the Mid-Bay Bridge will cause lane closures as well as bridge closures beginning next week.

Traffic will encounter intermittent lane closures from 8 p.m. to 5 a.m. March 29 through April 2 as crews perform routine roadway operations.

Closures

BridgeClosedThe bridge will be closed to all traffic from 11 p.m. to 5 a.m. March 31, April1 and April 2 as workers remove and replace tendons.

Alternative routes are State Roads 20 and 85 and U.S. 98.

Bridge closures will take place periodically through the months of April and May.

Variable message boards at each end of the bridge will alert drivers about restrictions.

Additionally, beginning at 11 p.m. March 31, the Mid-Bay Bridge will be restricted to only two-axle vehicles and single-axle trailers.

This load restriction is a cautionary measure intended to minimize the stresses on the bridge while permanent repairs are made.

Florida Department of Transportation news release

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s