Construction of a new Crestview Interstate 10 interchange has begun.
construction
Overnight lane closure on P.J. Adams
Traffic on P.J. Adams will be restricted to one lane Monday evening through Tuesday morning for storm drainage construction.
Wanted: Architect to design a fire station in Holt
Holt Fire District is looking for qualified licensed architects to build a new fire station.
Hwy 90 to be resurfaced
Resurfacing of Hwy 90 between Antioch and Old Bethel roads begins May 3.
Income surveys to Holt Water members arriving soon.
Holt Water Works needs all customers to respond to an income survey to help secure a grant for a new water well, pump and tower on Galliver Cutoff.
Search for engineers for new fire station to begin soon
The first phase of Holt's new fire station is set to begin April 5.
FDOT conducting I-10 widening study
The Florida Department of Transportation is conducting a study to widen Interstate 10 from four to six lanes from exit 22 to exit 56 in Crestview.
Hwy 189 resurfacing begins
The 14-miles stretch of Hwy 189 will be resurfaced beginning the week of May 11.
Smoky skies to the east of Holt now through March
Smoke seen over north Crestview is a controlled burn in conjunction of a roadway project near the airport.
Throwback Thursday: Holt connects to Alabama state line
Throwback Thursday: A new section of I-10 opens in 1969, connecting Holt to the Alabama state line.